SMALLTALK LAB
Find Graph Bridges in Squeak: Which Edge Disconnects Its Endpoints?
Build a bridge finder for small undirected graphs. Remove each edge in turn and test whether its endpoints can still reach each other, even when the graph starts out disconnected.
Before you begin
Open a Squeak Workspace. An edge is a two-element array of its vertex symbols, and its position identifies that edge. Use Print it on each entire checkpoint, including its temporary declarations.
These are native Squeak 6.1 examples. Each checkpoint is independent: open the download as text, copy one complete expression into Workspace and choose Print it. Do not file in the checkpoint collection as a class definition.
Expected values are Smalltalk expressions. The printer may show explicit Symbol markers: #(A B) and #(#A #B) represent the same array of Symbols.
01 - Model a triangle with a tail
The three sides of the triangle supply alternate routes. The fourth edge connects the triangle to D; we suspect it is a bridge. Each edge is undirected, so (C D) permits travel both ways.
| edges tail |
edges := #((A B) (B C) (C A) (C D)).
tail := edges at: 4.
{tail first. tail second}Expected: #(C D)

Try it: Look for a different route from A to B without using the first edge.
02 - Grow a set of reachable vertices
One pass finds B from A, but the route from B to C appeared earlier in the array. To make the result independent of edge order, keep scanning until a whole pass discovers no new vertex.
| edges seen |
edges := #((B C) (A B)).
seen := Set with: #A.
edges do: [:edge |
(seen includes: edge first) ifTrue: [seen add: edge second].
(seen includes: edge second) ifTrue: [seen add: edge first]].
{seen includes: #B. seen includes: #C}Expected: #(true false)

Try it: Swap the edge order and run again. Now both answers should be true.
03 - Skip one edge during the search
With edge 1 removed, A reaches B through C. With edge 4 removed, C cannot reach D. The set only grows; once a pass adds no vertex, all remaining edges incident to reachable vertices have been accounted for.
| reachable edges |
reachable := [:edgeList :start :skip | | seen before |
seen := Set with: start.
[
before := seen size.
edgeList withIndexDo: [:edge :index |
index = skip ifFalse: [
(seen includes: edge first) ifTrue: [seen add: edge second].
(seen includes: edge second) ifTrue: [seen add: edge first]]].
seen size > before
] whileTrue.
seen].
edges := #((A B) (B C) (C A) (C D)).
{(reachable value: edges value: #A value: 1) includes: #B.
(reachable value: edges value: #C value: 4) includes: #D}Expected: #(true false)

Try it: Repeat the first check with edge 2 excluded and start at B. Can B still get to C?
04 - Return the indices of the bridges
For each edge, start at one endpoint and search without that edge. If the other endpoint is missing from the reachable set, the deletion separates its original component. If the endpoints are still connected, any old route using the edge can use that alternate route instead.
| reachable bridges |
reachable := [:edgeList :start :skip | | seen before |
seen := Set with: start.
[
before := seen size.
edgeList withIndexDo: [:edge :index |
index = skip ifFalse: [
(seen includes: edge first) ifTrue: [seen add: edge second].
(seen includes: edge second) ifTrue: [seen add: edge first]]].
seen size > before
] whileTrue.
seen].
bridges := [:edges |
(1 to: edges size) select: [:i | | edge |
edge := edges at: i.
((reachable value: edges value: edge first value: i)
includes: edge second) not]].
(bridges value: #((A B) (B C) (C A) (C D))) asArrayExpected: #(4)

Try it: Add (D A) to close a second cycle. There should no longer be a bridge.
05 - Test graphs that start disconnected or empty
A graph does not have to start out connected. In the first case no triangle edge is a bridge, but removing X–Y splits its own component. The empty graph has no candidate edges. Vertices already isolated need not appear in this edge list to determine which edges are bridges.
| reachable bridges |
reachable := [:edgeList :start :skip | | seen before |
seen := Set with: start.
[
before := seen size.
edgeList withIndexDo: [:edge :index |
index = skip ifFalse: [
(seen includes: edge first) ifTrue: [seen add: edge second].
(seen includes: edge second) ifTrue: [seen add: edge first]]].
seen size > before
] whileTrue.
seen].
bridges := [:edges |
(1 to: edges size) select: [:i | | edge |
edge := edges at: i.
((reachable value: edges value: edge first value: i)
includes: edge second) not]].
{(bridges value: #((A B) (B C) (C A) (X Y))) asArray.
(bridges value: #()) asArray}Expected: #(#(4) #())

Try it: Add a separate two-edge path. Both of those new edges should be bridges.
06 - Keep parallel edges distinct
The two A–B entries are separate routes. Skipping one index leaves the other intact. The B–C edge is the only bridge. C–C is a loop, and a vertex can already reach itself without traversing an edge.
| reachable bridges |
reachable := [:edgeList :start :skip | | seen before |
seen := Set with: start.
[
before := seen size.
edgeList withIndexDo: [:edge :index |
index = skip ifFalse: [
(seen includes: edge first) ifTrue: [seen add: edge second].
(seen includes: edge second) ifTrue: [seen add: edge first]]].
seen size > before
] whileTrue.
seen].
bridges := [:edges |
(1 to: edges size) select: [:i | | edge |
edge := edges at: i.
((reachable value: edges value: edge first value: i)
includes: edge second) not]].
(bridges value: #((A B) (A B) (B C) (C C))) asArrayExpected: #(3)

Try it: What happens if you start over with only one copy of (A B)? Both A–B and B–C should now be bridges.
Replay the checkpoints

Reason about correctness and limits
Skip by index rather than deleting every matching pair. Otherwise parallel edges disappear together, which can turn an ordinary edge into a false bridge. Comparing endpoint reachability also avoids assuming the graph has exactly one component.
A cycle detector answers whether any cycle exists; this program identifies which individual edges are on no cycle in a simple undirected graph. Kruskal chooses a minimum-weight spanning forest; an edge selected by Kruskal is not automatically a bridge in the original graph.
This version trades speed for readable code. With V vertices and E edges it can make up to V full edge scans for each of E candidates, for O(V × E²) time in the worst case assuming typical constant-time Set operations. For large graphs, build adjacency lists and consider a depth-first low-link bridge algorithm instead.
Three practice challenges
Turn the tail into a cycle
Start with triangle A–B–C–A and a tail C–D–E. Add E–C. Which edge indices are bridges now?
Show solution
None. Every edge belongs to one of the two triangles.
Compare two components
Take edge list #((A B) (B C) (X Y) (Y Z) (Z X)). Which indices should be returned?
Show solution
1 and 2. The first component is a path with no alternative routes; the second is a triangle.
Reverse an edge
Replace (B C) with (C B) in a three-vertex path. Does the bridge result change?
Show solution
No. Our scan follows both directions, so both edges are still bridges.
Continue learning
Cycle Detection | Kruskal Spanning Tree | Bipartite Graphs
Environment reference: official Squeak documentation. This lesson and its examples are original. Verified using native Squeak 6.1 build 23976 on Linux.